Sewage plan of Kermanshah province


The first and second

Stage design studies

 

1391

Year studies

1420

The operation of the scheme

13245

The population (people)

23.78

The maximum daily rate (lit / sec)

6

Length (km)

200-250

Diameter (mm)

Corrugated double

Gender Tube

 22.5

Area (ha)


Published in Wastewater

1106 comments

Leave a comment

Make sure you enter the (*) required information where indicated. HTML code is not allowed.